This thread will house common fix posts.  It will be a sticky at the top of the maintenance section.
« Last Edit: February 11, 2017, 06:14:02 AM by Travis Gregory »

Travis Gregory

  • Administrator
  • U20 Enthusiast
  • *****
  • Posts: 230
  • U20 - 222
Running Rigging
« Reply #1 on: February 11, 2017, 06:23:46 AM »
Running Rigging Specifications

The Preferred Alternate for the Jib Furler Control line needs to be changed to 3/16” x 27’ (not 23’)

Please login to see the attachments.
« Last Edit: April 02, 2019, 10:14:00 PM by U20 Site Moderator »

Travis Gregory

  • Administrator
  • U20 Enthusiast
  • *****
  • Posts: 230
  • U20 - 222
Keel Repair
« Reply #2 on: February 11, 2017, 06:37:35 AM »
Keel Repair - Richard Hunt

Bayview had this problem with all six boats You can grind out the keel box two ways 1. drop the keel out of the box using a crane 2. take the keel plate off put the boat in the water and lower the keel out of the way (not to far) Dremel works great to grind out the cracks , clean out all the debris I used Epoxy with 406 adhesive filler to fill the cracks, a syringe is helpful to inject into the cracks then put 2" tape over the cracks to keep the epoxy in place and the sanding to a minimum. Then spray a little gelcoat over that for looks I also put 10 thought bolts in the keel box (5 a side) ,the pictures I sent show 4 total around the wedge area of the box ,these are old photos. 5 bolts a side help keep the keelbox from moving or flexing , epoxy does not like to flex . In photo 001 you can see the bolts going thought to the G-10 which is a good backing plate to hold the keel box together I did countersink the bolts Drill the holes for the keel bolts first before you epoxy the cracks The epoxy putty USI uses is ok it works . but even a boat that sees very little use will eventually leak into the air tight compartment I will take some more pictures if any body would like to see the 10 bolt system Richard Hunt.

Travis Gregory

  • Administrator
  • U20 Enthusiast
  • *****
  • Posts: 230
  • U20 - 222
Repair for the Wood Stringer Under the Mast Compression Post
« Reply #3 on: February 11, 2017, 06:39:32 AM »
Written by Steven Stollman #54

Travis Gregory

  • Administrator
  • U20 Enthusiast
  • *****
  • Posts: 230
  • U20 - 222
Make Your Own Turnbuckle Adjusters
« Reply #4 on: February 11, 2017, 06:44:08 AM »
Turn Buckle Construction

Here is a quick step by step guide to making the handles Its not hard on step 2 of the handles diagram change the word wrench to vice in the middle section. I am going to put together a photo guide step by step that will look a lot better. Then you can see how I position the 1/8" rod in the vice to make the bends. After you make the turnbuckle handle you must drill out the Ronstan turnbuckle Step 1. Find the pilot hole already there , put the turnbuckle in the vice hole facing up Step 2. Use a 1/8 inch carbide drill made for cutting metal and start drilling out the pilot hole Step 3. when you brake thought to the center go slow into the threaded side of the turnbuckle . The threads will want to make the drill bit drill off center so go nice and slow until you get threw the threads Step 4. Take the turnbuckle out of the vice tap it upside down to get all of the metal shavings out Step 5. I use a 1/4 32 tap to clean up the threads of the Ronstan turnbuckle after drilling to make sure there are no snags with the shroud That's it put the handle and the turnbuckle together I use white electrical tape on the handles so they don't pull apart. You can use a small piece of Velcro maybe 4' inch's long 1/2 wide or less double sided at the base of the Ronstan turnbuckle Tie one end to the base of the ronstan turnbuckle and rap the Velcro around the handle to secure them in place when not in use. Last Step 1. A handle to go on the shroud I use a 1'' delron plastic rod 2 1/2 '' inch's long and drill a 1/4 ''inch hole thought the center of the rod 2. I use a scribe to scratch out the inside of the 1/4 ''inch hole so it does not slip when around the shroud. just something for the epoxy to grab hold of. 3. After that I put the plastic rod on the belt sander to shape it into a flat oval kind of shape 4 I take a file and put a few vertical scratches on the shroud tang where the handle will be 5. Tape the threads so epoxy does not drip down on to the threads (you can epoxy the handles on when the mast is up) or you need something to hold the shrouds up wile epoxy sets a vice works 6 Put a little slow epoxy on the tang of the shroud 7 Slip the handle into place. turning as you go up. to spread the epoxy around 8. Put tape on the bottom of the turnbuckle handle to hold it in place. 9. Drip more epoxy in the top of the hole if needed 10. If it is too warm out and the epoxy is running out of the bottom of the turnbuckle you can use a filler in the epoxy I have used the west system 406 adhesive filler to give it a little body and to help it stick to the handle and shroud That's it. They work great . No tools needed to raise or lower the mast and tuning is a hole lot easer. Richard Hunt mad man at work.

Travis Gregory

  • Administrator
  • U20 Enthusiast
  • *****
  • Posts: 230
  • U20 - 222
Dyform Guide
« Reply #5 on: September 03, 2017, 09:36:55 PM »
Complements of Brady Lofthouse (Forty-Two)

U20 Site Moderator

  • Administrator
  • U20 Old Timer
  • *****
  • Posts: 86
Halyard Specifications
« Reply #6 on: April 02, 2019, 10:13:18 PM »
Courtesy of Don Corey

U20 Main Halyard Specification (original wire/rope configuration)

Top to bottom description:

Wichard #81432 keypin shackle w/bar attached by
Thimble and Nicopress eye to
1/8” 7x19 SS wire with
Swage ball stop with a length of
28’-10 ½” CL of shackle pin to CL of ball stop with
3” to 4” of wire past ball stop to start of wire rope splice using
33’ of Ό” Sta Set double braid (white w/red fleck) with
Reeving splice on end


U20 Jib Halyard Specification (original wire configuration)

3/16" keypin shackle w/bar (1 1/2" long) attached to
3/32" 7x19 SS wire 25'-2" eye/eye
Eye at each end comprised of 3/32" thimble and 3/32" Nicopress sleeve

U20 Site Moderator

  • Administrator
  • U20 Old Timer
  • *****
  • Posts: 86
Source for U20 Plastic Parts
« Reply #7 on: November 10, 2020, 06:14:30 PM »
Gary's Plastics created many of the plastic parts found on the boat and is a good source for replacements. Parts they build:

  • Keel Wedges
  • Hatch Rails
  • Floor Boards
  • Other parts as needed

Contact Gary at https://garysplasticplace.com
« Last Edit: November 16, 2020, 03:38:43 AM by Travis Gregory »

U20 Site Moderator

  • Administrator
  • U20 Old Timer
  • *****
  • Posts: 86
Source for U20 Graphics / Decals
« Reply #8 on: November 16, 2020, 03:40:33 AM »
PPD graphics in Santa Cruz

831-479-9098

office at ppdmultimedia.com

U20 Site Moderator

  • Administrator
  • U20 Old Timer
  • *****
  • Posts: 86
Mast Suppliers
« Reply #9 on: November 16, 2020, 03:42:37 AM »
Aluminum
The mast, rigging and 'high wind kits' are available from Ballenger Spars (Watsonville, Ca.)  831-763-1196


Current Class Approved carbon:  https://fortecarbon.com/


U20 Site Moderator

  • Administrator
  • U20 Old Timer
  • *****
  • Posts: 86
Rail Replacements
« Reply #10 on: April 12, 2022, 03:43:57 AM »
Rail Makers - Costa Mesa California

https://www.railmakers.com


U20 Site Moderator

  • Administrator
  • U20 Old Timer
  • *****
  • Posts: 86
Standing Rigging Dimmensions
« Reply #11 on: April 21, 2022, 09:49:23 PM »
Compliments of Tim Porter and Don Corey:


U20 Standing Rigging dimensions – original Ballenger aluminum mast
from Don Corey on 6/11/18 – dimensions may vary from boat to boat. Before ordering confirm
these dimensions against boats existing rigging.

Upper shrouds:
5/32” wire x 27’- 3 Ό” from T-ball swage bearing surface to end of swage stud for Ronstan Sealoc
turnbuckle.

Lower shrouds:
5/32” wire x 14’- 3 3/8” from T-ball swage bearing surface to end of swage stud for Ronstan Sealoc
turnbuckle’.

Forestay lower:
5/32” wire x 25’- 9 7/8” from C/L of 5/16” pin of custom marine swage eye to C/L of Ό” pin of aircraft
swage eye. Custom marine swage eye at bottom of forestay has two 3/8” ID loops made of 3/16” wire
welded to side of eye.

Forestay upper:
4mm Alps “xxx” strand 1x7 wire x 11 1/8” from T-ball swage bearing surface to C/L of Ό” pin of aircraft
swage eye.

U20 Site Moderator

  • Administrator
  • U20 Old Timer
  • *****
  • Posts: 86
Mast Up Cover Vendor
« Reply #12 on: May 08, 2022, 04:51:25 PM »
At the time of this post, Masthead is not building covers.  An alternative has been found:

U20 skirted.  $1875 + $125 Gore Tex Thread = $2,000
U20 non-skirted.  $1500 + $125 Gore Tex Thread = $1,625

Plus shipping